BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//NAWIC NWA - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:NAWIC NWA
X-ORIGINAL-URL:https://nawicnwa.org
X-WR-CALDESC:Events for NAWIC NWA
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20210314T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20211107T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20220313T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20221106T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20230312T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20231105T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20220615T153000
DTEND;TZID=America/Chicago:20220615T173000
DTSTAMP:20260419T032412
CREATED:20220604T081519Z
LAST-MODIFIED:20220613T081515Z
UID:3040-1655307000-1655314200@nawicnwa.org
SUMMARY:NAWIC Fruition of a Project | Osage Park Tour & Happy Hour
DESCRIPTION:Tour of Osage Park with the EDG to learn the behind the scenes process of bringing a project concept to fruition.  Followed by a Happy Hour!\n\n\nOSAGE PARK \nOsage Park is an urban park designed as the recreational destination location in Bentonville\, Arkansas. It’s preserved and enhanced wetland system acts as a ‘soft infrastructure’ that soaks up and filters stormwater; slowly releasing it\, decreasing flooding downstream\, and improving water quality. \nThe Osage Park design team lead by Martin Smith\, (EDG Principal & OK State Alumni) studied in depth the watershed\, ecology and natural systems of this site prior to implementing the design strategies.  The design was orchestrated in harmonious fashion with the pavilion\, natural wetland system along with the passive and active programming for the project. \nExisting wetlands created by beavers were already providing habitat for many species on site\, including several of conservation concern. These wetlands also slowed stormwater runoff\, improved water quality\, helped recharge groundwater aquifers\, and reduce flooding downstream. There was a conscious effort to expand and integrate the park with the beaver wetlands and create a connection to Lake Bentonville increasing these benefits. The preservation of the flooded beaver wetlands provides a firsthand look at a delicate wetland system and educates visitors on the importance of the wetlands in an urban watershed. \n_____________________________________________ \nECOLOGICAL DESIGN GROUP  |  EDG  |   ecologicaldg.com \nEcological Design Group\, Inc. is a small business by choice\, recognizing our passion and commitment to the re-connectivity of our community to the landscape. Over the past century\, our natural ecological systems have been fragmented due to development and the introduction of industrial agriculture. The seamless connectivity from one system to another no longer exists and has been replaced by sterile environments requiring an abundance of energy and natural resources to maintain. \n \n_________________ : : HAPPY HOUR AT BENTONVILLE BREWING CO FOLLOWING THE TOUR : : _________________
URL:https://nawicnwa.org/event/nawic-fruition-of-a-project-osage-park-tour-happy-hour/
LOCATION:Osage Park\, 700 SW 16th St\, Bentonville\, AR\, 72712\, United States
END:VEVENT
END:VCALENDAR